Utility Development Fees as of 1/1/2025
Utility Development Permits applied for on or after January 1, 2025 will reflect the below Utility Development Fees as authorized by Brevard County Resolution number 2024-1158, adopted October 22, 2024.
The fees listed herein are intended to assist in estimating total permit fees. Fees for individual projects may vary dependent on circumstances. Fees on permit applications entered incorrectly or in error, including but not limited to duplicate entries, will not be refunded.
Service | Fee |
---|---|
Plan Review | $90.00 |
Reinspections | $360.00 |
Inspection | $360.00 |
Service | Fee |
---|---|
Minor Site Plan 3rd and subsequent reviews | $120.00 |
Minor Site Plan Inspection each additional phase | $200.00 |
Minor Site Plan Inspection Fees Construction Costs less than $20,000 | $400.00 |
Minor Site Plan Review | $400.00 |
Service | Fee |
---|---|
Full Site Plan | $500 + $90.00 per rounded acre |
Inspection Major Site Plan Each Additional Phase | $300.00 |
Pre-App Conference Site Plan | $200.00 |
Site Plan 3rd and Subsequent Reviews | $120.00 |
Site Plan Inspection Fees Construction Costs Less Than $20,000 | $400.00 |
Site Plan Inspection Fees for the Portion of Dedicated Utility Construction Costs up to $500,000 | 2% x Construction Costs |
Site Plan Inspection Fees for the Portion of Dedicated Utility Construction Costs $500,001 - $1,000,000 | 1.5% x Construction Costs |
Site Plan Inspection Fees for the Portion of Dedicated Utility Construction Costs Over $1,000,001 | 1% x Construction Costs |
Waiver Request Site Plans Requiring Engineering Review | $250.00 |
Service | Fee |
---|---|
Amended Site Plan Review | 75% of USD Engineering Original Fee |
Service | Fee |
---|---|
Engineering Revision to Approved Plan | $300.00 |
Utilities After Hours Inspections | $100 per hour, 4 hour minimum |
Service | Fee |
---|---|
Preliminary Plat/Engineering Review if required with Site Plan | $400.00 |
Preliminary Plat/Engineering Review{ if over 50 acres) | $600 + $18 per lot |
Preliminary Plat/Engineering Review { if 50 acres or less) | $300 + $18 per lot |
Service | Fee |
---|---|
Pre-Plat - Final Plat - Final Engineering Review | $500.00 |
Final Plat - Replat Review | $250.00 |
Service | Fee |
---|---|
Waiver Request Subdivisions Requiring Engineering Review | $250.00 |
Subdivision Pre-App Conference | $400.00 |
Subdivision Inspection Fees for the Portion of Dedicated Utility Construction Costs up to $500,000 | 2.5% x Construction Costs |
Subdivision Inspection Fees for the Portion of Dedicated Utility Construction Costs between $500,001 - $1,000,000 | 2% x Construction Costs |
Subdivision Inspection Fees for the Portion of Dedicated Utility Construction Costs over $1,000,001 | 1% x Construction Costs |
Service | Fee |
---|---|
Final Plat Submittal | $350.00 |
Service | Fee |
---|---|
Right-of-Way Permit Utility Analysis | $180.00 |
Brevard County is currently in the process of implementing changes to increase the accessibility of information and documents on its website. If you require assistance to better access these documents or information contained therein please contact the County’s ADA Coordinator by phone at (321) 637-5347 or by email at ADACompliance@BrevardFL.gov
Adobe® Acrobat® Reader® DC is free software you can use to read and access the information contained within PDF files. Adobe Acrobat Reader DC contains many capabilities specifically designed to make it easier for people with disabilities to read PDF files, regardless of whether the files have been optimized for accessibility. It leverages accessibility functions built into Windows® and Mac OS systems and allows adjustment of user preferences to optimize the reading experience for a variety of disabilities.